The engine was finally rewheeled on Friday 12th January 960x640 Baxter1.JPG |
New buffer beam in place (28 Aug 07) 960x640 DCP_0012.JPG |
New boiler plate welded into position (28 Aug 07) 960x640 DCP_0013.JPG |
Katy Brown painting the smokebox (1st May) 901x640 Baxter1-010508.JPG |
Boiler, frames and tanks (1st May) 923x640 Baxter2-010508.JPG |
Dave Martin working! (1st May) 685x640 Baxter3-010508.JPG |
Firebox repair and Stuart Marks legs (1st May) 747x640 Baxter4-010508.JPG |
New washout plugs on backhead 960x640 Baxter5-010508.JPG |