Baxter Rebuild
20th January 2007
<-- Index | Showing 1-8 of 8 pictures | Index -->
The engine was finally rewheeled on Friday 12th January
The engine was finally rewheeled on Friday 12th January
960x640
Baxter1.JPG
New buffer beam in place (28 Aug 07)
New buffer beam in place (28 Aug 07)
960x640
DCP_0012.JPG
New boiler plate welded into position (28 Aug 07)
New boiler plate welded into position (28 Aug 07)
960x640
DCP_0013.JPG
Katy Brown painting the smokebox (1st May)
Katy Brown painting the smokebox (1st May)
901x640
Baxter1-010508.JPG
Boiler, frames and tanks (1st May)
Boiler, frames and tanks (1st May)
923x640
Baxter2-010508.JPG
Dave Martin working! (1st May)
Dave Martin working! (1st May)
685x640
Baxter3-010508.JPG
Firebox repair and Stuart Marks legs (1st May)
Firebox repair and Stuart Marks legs (1st May)
747x640
Baxter4-010508.JPG
New washout plugs on backhead
New washout plugs on backhead
960x640
Baxter5-010508.JPG